Rung Sac Base, Can Gio
1541 Rung Sac Road, An Nghia Hamlet, An Thoi Dong Commune, Ho Chi Minh City
Production ready
PAI 3.3
Crew size: Large (50+)
Processing time: 6 days
Category: Natural landscapes
Rung Sac Base – A unique natural setting within a mangrove forest. Rung Sac Base is a national historical site located in the heart of the Can Gio mangrove forest, associated with the combat operations of the Rung Sac Special Task Force during the Vietnam War. The site is situated within the Can Gio mangrove ecosystem, offering both historical significance and a unique natural landscape. For film production, this location creates a distinct contrast between the mangrove forest, waterways, and the reconstructed war-zone areas. The water surface, vegetation, and forest terrain provide depth to the frame; wide shots, tracking shots along paths or water, and low-angle shots can effectively capture the scale of the landscape. The reconstructed war-zone structures are suitable for scenes requiring historical context. The location is well-suited for historical films, war dramas, documentaries, and productions depicting resistance-era settings.
Location fees
General information
Charging model
No data available
Deposit
No data available
Notes
Current regulations do not specify standard fee rates. Film crews must contact the location management unit directly for specific guidance.
Filming location fee schedule
| Item | Fee |
|---|---|
| Hourly fee | No data available |
| Daily fee | No data available |
| Overtime fee | No data available |
Applicable policy
Fee discount/waiver policy
Preferential policies are available for both domestic and international film crews.
Applicable conditions
Film crews must submit an official request letter detailing crew size and shooting schedule, and may be required to submit a script or synopsis for the management unit's review and approval: - For international film crews: Applications must be submitted to the Ministry of Culture, Sports and Tourism to obtain a License for Providing Film Production Services Using Locations in Vietnam. Processing time is 20 days from the receipt of a complete and valid dossier. - For domestic film crews: A permit from state management agencies for cinema is not required, but permission must be obtained directly from the authority or unit managing the location.
Location rules
Comply with the regulations of the site management authority, including requirements for protecting the current state, landscape, and areas of historical value during production.
No littering; maintain general cleanliness.
Do not move, alter, or disturb any structures, traces, artifacts, or spaces within the protected area of the monument.
Infrastructure
Accessibility
Canoe
Boat
16-45 seat vehicle
Car / 16-seat vehicle
Motorbike
Production support
Drone filming allowed
Night filming allowed
Transport service
Authority coordination support
Low noise
Facilities
Three-phase power
4G/5G internet
Waiting area
Set building area
Water source
Restrooms
Location map
Contact information
Temperature
28°C
Feels like 32.4°C
Weather
Mưa nhẹ
Humidity 75%
Wind direction
Northeast
13.8 m/s
Sunrise / sunset











