Hoang Van Thu Bridge
Connecting the Hong Bang District area and the northern bank of the Cam River in Thuy Nguyen District., Thuy Nguyen Ward, Hai Phong City
Production ready
PAI 3.2
Crew size: Medium (16-50)
Processing time: 15 days
Category: Urban spaces
Hoang Van Thu Bridge - A 'Seabird Wing' Spanning the Heart of the City Spanning the Cam River and connecting Hong Bang District with Thuy Nguyen District, Hoang Van Thu Bridge is a key infrastructure project marking the development of Hai Phong's new urban space. The bridge features the longest concrete-filled steel tubular arch structure in Vietnam, inspired by the image of a 'seabird wing' soaring out to sea. For producers and location directors, Hoang Van Thu Bridge offers a highly iconic urban cinematic backdrop. The southern approach bridge is designed with two symmetrical circular ramps, combined with a modern artistic LED lighting system at night, creating vivid, multi-dimensional cinematic angles. The intersection of the bustling Cam River, filled with ships, and the smart urban landscape on both banks provides a striking futuristic and industrial visual effect. The spacious multi-lane traffic infrastructure, with quick connectivity to the new Administrative Center and Cat Bi International Airport, allows film crews to optimize equipment transportation and manage traffic diversions for filming. This location is exceptionally well-suited for action chase sequences, modern television dramas, commercial advertisements (automotive/motorcycle TVCs), music videos, and architectural documentaries. Compiled by PTIT - Image source: Internet
Location fees
General information
Charging model
No data available
Deposit
No data available
Notes
No data available
Filming location fee schedule
| Item | Fee |
|---|---|
| Hourly fee | No data available |
| Daily fee | No data available |
| Overtime fee | No data available |
Applicable policy
Fee discount/waiver policy
Preferential policies apply to domestic and international film crews.
Location rules
Maintain general cleanliness.
Be mindful of traffic and vehicles.
Infrastructure
Accessibility
Canoe
Boat
16-45 seat vehicle
Car / 16-seat vehicle
Container truck
Motorbike
Production support
Drone filming allowed
Night filming allowed
Transport service
Authority coordination support
Facilities
Three-phase power
Near hospital
4G/5G internet
Waiting area
Set building area
Water source
Backup power
Restrooms
Location map
Contact information
Temperature
26.8°C
Feels like 33.6°C
Weather
Mây rải rác
Humidity 78%
Wind direction
East
10.2 m/s
Sunrise / sunset










