VFP Logo

VIETNAM FILM DEVELOPMENT ASSOCIATION

Address: 32 Hao Nam Street, O Cho Dua Ward, Hanoi, Vietnam

Email: officevfda@gmail.com

Website: https://vfda.vn/en/

FILMING LOCATIONS

  • All Nationwide Locations
  • Hanoi Filming Locations
  • Ho Chi Minh City Locations
  • Da Nang Filming Locations
  • Ninh Binh Filming Locations
  • Quang Ninh Filming Locations

PERMITS & SUPPORT

  • Filming Permits Guide
  • Local Field Support
  • Authority Coordination
  • Financial Incentives & Grants

QUICK LINKS

  • About PAI & VFDA
  • Frequently Asked Questions (FAQ)
  • Cinema News & Insights
  • Search Film Database
  • Submit Coordination Request

Sponsored by Vietnam Film Development Association and Posts and Telecommunications Institute of Technology

Production Attractiveness Index (PAI)•Vietnam Film Platform

Copyright © 2026 Ha Noi, Vietnam

Terms of Service•Privacy Policy
VFP Logo
Log in
Log in
HOMELOCATIONSPERMITSFIELD SUPPORTFINANCIAL SUPPORTNEWS
Tuyen Quang Province
Home
Locations

Tuyen Quang Province

Tuyen Quang Province

Located in Northern Vietnam, Tuyen Quang province offers diverse natural landscapes and valuable historical architecture for film projects. Known as the "Capital of the Liberated Zone," the locality preserves numerous special national historical monuments, traditional stilt houses, and unique cultural spaces of indigenous ethnic groups. Tuyen Quang's terrain stretches from primeval forests and majestic limestone mountain ranges to the Na Hang – Lam Binh Nature Reserve. The Gam and Lo river systems flowing through the area create poetic riverine landscapes. Visual highlights include vast mountain valleys, dense forest canopies, and natural freshwater lakes surrounded by sheer cliffs, providing flexible filming locations for various storylines. With these characteristics, Tuyen Quang is a suitable location for historical films, period dramas, exploration-action, adventure, and documentary projects. Production logistics are convenient thanks to direct road connections from Hanoi, local accommodation systems, and support from regional authorities.

Overview

Located in Northern Vietnam, Tuyen Quang province offers diverse natural landscapes and valuable historical architecture for film projects. Known as the "Capital of the Liberated Zone," the locality preserves numerous special national historical monuments, traditional stilt houses, and unique cultural spaces of indigenous ethnic groups. Tuyen Quang's terrain stretches from primeval forests and majestic limestone mountain ranges to the Na Hang – Lam Binh Nature Reserve. The Gam and Lo river systems flowing through the area create poetic riverine landscapes. Visual highlights include vast mountain valleys, dense forest canopies, and natural freshwater lakes surrounded by sheer cliffs, providing flexible filming locations for various storylines. With these characteristics, Tuyen Quang is a suitable location for historical films, period dramas, exploration-action, adventure, and documentary projects. Production logistics are convenient thanks to direct road connections from Hanoi, local accommodation systems, and support from regional authorities.

View legal documents
PAI SCORE1.8/ 5

PRODUCTION-READY

012345FinancialsupportInformationsupportField supportLegalproceduresProductioninfrastructure
PAI SCORE1.8/ 5

PRODUCTION-READY

012345FinancialsupportInformationsupportField supportLegalproceduresProductioninfrastructure

13

Filming locations

7 days

Permit processing time

6 vehicle types

Accessibility

Large / Small

Suitable crew size

Available

Local Support Agencies

13

Filming locations

7 days

Permit processing time

6 vehicle types

Accessibility

Large / Small

Suitable crew size

Available

Local Support Agencies

FEATURED LOCATIONS IN TUYEN QUANG PROVINCE

View all locations
Na Hang Ecotourism Area

Na Hang Ecotourism Area

Tuyen Quang Province

PAI 1.8

Production ready

Permit processing time7 days
Accessibility4 vehicle types
Suitable crew sizeLarge

View details

Sung La Valley

Sung La Valley

Tuyen Quang Province

PAI 1.8

Production ready

Permit processing time7 days
Accessibility4 vehicle types
Suitable crew sizeLarge

View details

Hmong King Palace

Hmong King Palace

Tuyen Quang Province

PAI 1.8

Production ready

Permit processing time7 days
Accessibility4 vehicle types
Suitable crew sizeLarge

View details

Dong Van Ancient Town

Dong Van Ancient Town

Tuyen Quang Province

PAI 1.8

Production ready

Permit processing time7 days
Accessibility4 vehicle types
Suitable crew sizeLarge

View details

Hong Thai Communal House

Hong Thai Communal House

Tuyen Quang Province

PAI 1.8

Production ready

Permit processing time7 days
Accessibility4 vehicle types
Suitable crew sizeLarge

View details

Tien Cave Scenic Site

Tien Cave Scenic Site

Tuyen Quang Province

PAI 1.8

Production ready

Permit processing time7 days
Accessibility4 vehicle types
Suitable crew sizeMedium

View details

Ma Le Ancient Village

Ma Le Ancient Village

Tuyen Quang Province

PAI 1.8

Production ready

Permit processing time7 days
Accessibility4 vehicle types
Suitable crew sizeSmall

View details

Lung Cam Cultural Tourism Village

Lung Cam Cultural Tourism Village

Tuyen Quang Province

PAI 1.8

Production ready

Permit processing time7 days
Accessibility4 vehicle types
Suitable crew sizeLarge

View details

Tan Trao Communal House

Tan Trao Communal House

Tuyen Quang Province

PAI 1.8

Production ready

Permit processing time7 days
Accessibility4 vehicle types
Suitable crew sizeLarge

View details

Noong Lake

Noong Lake

Tuyen Quang Province

PAI 1.8

Production ready

Permit processing time7 days
Accessibility6 vehicle types
Suitable crew sizeLarge

View details

Na Hang Ecotourism Area

Na Hang Ecotourism Area

Tuyen Quang Province

PAI 1.8

Production ready

Permit processing time7 days
Accessibility4 vehicle types
Suitable crew sizeLarge

View details

Sung La Valley

Sung La Valley

Tuyen Quang Province

PAI 1.8

Production ready

Permit processing time7 days
Accessibility4 vehicle types
Suitable crew sizeLarge

View details

Hmong King Palace

Hmong King Palace

Tuyen Quang Province

PAI 1.8

Production ready

Permit processing time7 days
Accessibility4 vehicle types
Suitable crew sizeLarge

View details

Dong Van Ancient Town

Dong Van Ancient Town

Tuyen Quang Province

PAI 1.8

Production ready

Permit processing time7 days
Accessibility4 vehicle types
Suitable crew sizeLarge

View details

Hong Thai Communal House

Hong Thai Communal House

Tuyen Quang Province

PAI 1.8

Production ready

Permit processing time7 days
Accessibility4 vehicle types
Suitable crew sizeLarge

View details

Tien Cave Scenic Site

Tien Cave Scenic Site

Tuyen Quang Province

PAI 1.8

Production ready

Permit processing time7 days
Accessibility4 vehicle types
Suitable crew sizeMedium

View details

Ma Le Ancient Village

Ma Le Ancient Village

Tuyen Quang Province

PAI 1.8

Production ready

Permit processing time7 days
Accessibility4 vehicle types
Suitable crew sizeSmall

View details

Lung Cam Cultural Tourism Village

Lung Cam Cultural Tourism Village

Tuyen Quang Province

PAI 1.8

Production ready

Permit processing time7 days
Accessibility4 vehicle types
Suitable crew sizeLarge

View details

Tan Trao Communal House

Tan Trao Communal House

Tuyen Quang Province

PAI 1.8

Production ready

Permit processing time7 days
Accessibility4 vehicle types
Suitable crew sizeLarge

View details

Noong Lake

Noong Lake

Tuyen Quang Province

PAI 1.8

Production ready

Permit processing time7 days
Accessibility6 vehicle types
Suitable crew sizeLarge

View details

FINANCIAL SUPPORT & INCENTIVES

Support / fee waiver policies

Accommodation support

Transport support

International crew / project support

PROCEDURES & PERMITS

View procedure guide
Average permit processing time7 days
Receiving agencyDepartment of Culture, Sports and Tourism of Tuyen Quang Province
Submission addressNo. 157, 17/8 Street, Minh Xuan Ward, Tuyen Quang Province
Contact emailsovhttdl@tuyenquang.gov.vn
Contact information02073.822.683
Permit workflow
  • Step 1:Prepare the application documents (synopsis, crew list, and specific filming schedule and locations).
  • Step 2:Submit the application for the permit at the One-Stop Shop of the Department of Culture, Sports and Tourism of Tuyen Quang Province.
  • Step 3:Awaiting review, providing location explanations (if requested), and receiving the permit.

INFRASTRUCTURE

A. Access & accommodation

Transport infrastructure

Inter-provincial expressways, Other: National highways / Mountain passes connecting provinces

Vehicle accessibility

Accessible by container trucks, Accessible by 16-45 seat coaches, Accessible by motorcycles and rudimentary vehicles, Accessible by heavy-duty trucks, Accessible by 16-seat vans and passenger cars, Accessible by boats

Accommodation quality

0 4-5 star hotels, 8 3-star hotels, 200 homestays

B. Operational support capacity

Transport & mobility support

Specialized equipment transport trucks, Taxi, 16-45 seat vehicle rental

Equipment availability

Basic equipment

Local support manpower

Extras, Drivers, Logistics, Loaders/Riggers, Security

FINANCIAL SUPPORT

Tuyen Quang Province offers attractive financial incentives for international and domestic film crews. Contact the locality for details on tax relief, fee waivers, and production cost support.