Vietnam Film Production
PTIT

VIETNAM FILM DEVELOPMENT ASSOCIATION

Address: 32 Hao Nam Street, O Cho Dua Ward, Hanoi, Vietnam

Email: officevfda@gmail.com

Website: vfda.vn

FILMING LOCATIONS

  • All Nationwide Locations
  • Hanoi Filming Locations
  • Ho Chi Minh City Locations
  • Da Nang Filming Locations
  • Ninh Binh Filming Locations
  • Quang Ninh Filming Locations

PERMITS & SUPPORT

  • Filming Permits Guide
  • Local Field Support
  • Authority Coordination
  • Financial Incentives & Grants

QUICK LINKS

  • About PAI & VFDA
  • Frequently Asked Questions (FAQ)
  • Cinema News & Insights
  • Search Film Database
  • Submit Coordination Request

Sponsored by Vietnam Film Development Association and Posts and Telecommunications Institute of Technology

Copyright © 2026 Ha Noi, VietnamTerms of ServicePrivacy Policy
Vietnam Film Production
HOMELOCATIONSPERMITSFIELD SUPPORTFINANCIAL SUPPORTNEWS
Log in
Home
Locations

Quang Ngai Province

PRODUCTION-READYPAI 52.0

Quang Ngai Province

View legal documents

No matching results found

  • 28

    Filming locations

  • No data available

    Permit processing time

  • 6 vehicle types

    Accessibility

  • Large / Medium

    Suitable crew size

  • Available

    Local Support Agencies

Overview

Quang Ngai, a land rich in historical and cultural traditions in Central Vietnam, is a harmonious picture blending the majestic beauty of mountains and forests with the pristine, romantic charm of islands and seas. The destination is highlighted by Ly Son Island carrying the imprint of island culture, crystal-clear blue beaches, fascinating rock formations, historical relics, traditional craft villages, and the unique cultural space of indigenous ethnic groups. Especially for filmmakers, Quang Ngai opens up a multi-faceted film set, ranging from pristine seas and islands, unique volcanic rock cliffs, and coastal fishing villages to vast primeval forests, waterfalls, and villages rich in cultural identity. The diversity in landscapes and cultural materials creates a rich source of creative inspiration for cinematic projects.

PAI SCORE

52.05012345678920123456789.00123456789/ 100

PRODUCTION-READY
FinancialsupportInformationsupportFieldsupportLegalproceduresProductioninfrastructure

PROCEDURES & PERMITS

Average permit processing time
No data available
Receiving agency
Department of Culture, Sports and Tourism of Quang Ngai Province
Submission address
105 Hung Vuong Street, Cam Thanh Ward, Quang Ngai Province
Contact email
svhtt@quangngai.gov.vn
Contact information
02553.822.716
Permit workflow
  1. Step 1:Chuẩn bị hồ sơ (kịch bản tóm tắt, danh sách thành viên đoàn, thời gian và địa điểm quay cụ thể).
  2. Step 2:Nộp hồ sơ xin phép tại bộ phận Một cửa của Sở Văn hoá, Thể thao và Du lịch tỉnh Quảng Ngãi.
  3. Step 3:Chờ thẩm định, giải trình bối cảnh (nếu được yêu cầu) và nhận giấy phép.
View procedure guide

FEATURED LOCATIONS IN QUANG NGAI PROVINCE

View all locations
  • Chau Me Beach

    Chau Me Beach

    PAI 52.0

    Quang Ngai Province

  • Bui Hui Steppe

    Bui Hui Steppe

    PAI 52.0

    Quang Ngai Province

  • Ra Manh Village and Dak Drinh Lodge

    Ra Manh Village and Dak Drinh Lodge

    PAI 52.0

    Quang Ngai Province

  • An Sen Lagoon

    An Sen Lagoon

    PAI 52.0

    Quang Ngai Province

  • Sa Huynh Salt Fields

    Sa Huynh Salt Fields

    PAI 52.0

    Quang Ngai Province

  • Bau Ca Cai

    Bau Ca Cai

    PAI 52.0

    Quang Ngai Province

INFRASTRUCTURE

A. Access & accommodation

  • Transport infrastructure

    Railway station — Quang Ngai Railway Station, Inter-provincial expressway — Da Nang – Quang Ngai Expressway, Seaport — Dung Quat International Port

  • Vehicle accessibility

    Container truck accessible — National Highway 1A, the Doc Soi road in Dung Quat Economic Zone, and main thoroughfares in Quang Ngai City (such as Hoang Sa, Truong Sa, and Hung Vuong streets) are spacious, making it fully convenient for container trucks and logistics tractors to move in and out for cargo unloading., Large truck accessible — Most district roads and inter-commune provincial roads have been solidly paved with asphalt or concrete, allowing heavy-duty trucks to travel smoothly., 16-45 seat coach accessible — Large tourist passenger buses can easily access major tourist destinations (Sa Huynh, My Lai, Sa Ky port)., 16-seat van and car accessible, Motorbike and light vehicles only, Boat access

  • Accommodation quality

    0 4-5 star hotels, 8 3-star hotels, 107 homestays

B. Operational support capacity

  • Transport & mobility support

    Specialized equipment trucks, 16-45 seat coach rental, Taxi, Ride-hailing services

  • Equipment availability

    Basic equipment — • The locality can only supply basic equipment such as general event/stage sound and lighting systems, LED screens, standard generators, scaffolding, walkie-talkies, and certain mechanical and labor protection tools for technical construction.

  • Local support manpower

    Extras / background actors, Loading crew, Drivers, Security, Logistics crew

FINANCIAL SUPPORT & INCENTIVES

View financial policy details

Support / fee waiver policies

  • Investment incentives and direct financial support for projects focused on the development of the film industry and cultural creativity. (Condition: Organizations and individuals with film production or cultural heritage projects in the province/city.)
  • Value Added Tax (VAT) refund for expenses incurred during production and filming in the locality. (Condition: Film projects with foreign elements that meet the criteria for promoting Vietnamese culture, tourism, and the country and its people.)
  • Exemption or reduction of entrance and filming fees at state-managed historical sites and scenic landmarks. (Condition: Documentaries, public-information projects and non-commercial tourism promotion. Requires an official approval letter from the provincial/city culture authority.)

Logistics support

  • Authorization for the partial use of sidewalks and roadways for mobile parking and the staging of filming equipment. (Condition: Requires a filming permit and written approval of the traffic diversion plan from the competent local authority.)
  • Priority fast-track processing for temporary import and re-export procedures regarding specialized filming machinery and equipment from abroad. (Condition: Applicable to international co-production film projects, provided that complete documentation and a detailed equipment manifest are declared in advance to the Customs authorities.)
  • Local authorities will coordinate traffic control, temporary cordoning, and ensure security and order at public filming locations. (Condition: Submit an official request letter with the shooting script to the local commune/ward police at least 3–5 working days in advance.)

Accommodation support

  • Special preferential rates (10%–30% off the listed price) at 3- to 5-star hotels in the province/city. (Condition: Film crews must book a large volume of rooms (typically 10 rooms or more) or commit to a long-term stay at accommodation facilities that are official partners (Vendors) of the platform.)
  • Helping film crews access local tourism stimulus packages (including room discounts and complimentary vouchers for dining, laundry and meeting rooms for script readings). (Condition: Film projects that directly promote local culture and tourism, with written confirmation or sponsorship from the provincial/city culture or tourism authority.)
  • A network of serviced apartments and homestays near filming locations, with the best monthly rental discounts reserved for production crews, logistics teams and cast members who need privacy. (Condition: The production team must sign a long-term accommodation contract (exceeding 15 days or 1 month) facilitated by the designated local field support coordinator.)

International crew / project support

  • Support for filming permit procedures for projects involving foreign elements. (Condition: Film projects invested in or co-produced by foreign organizations or individuals, with scripts compliant with the regulations of the Vietnam Cinema Law.)
  • Priority customs clearance procedures (temporary import and re-export of equipment) for equipment brought into Vietnam from abroad. (Condition: The production crew must have been granted a filming permit in Vietnam and must provide an equipment inventory (packing list) that matches the customs declaration documents.)
  • Support for visa and entry procedures. (Condition: The film crew/cast list must be approved by the Ministry of Culture, Sports and Tourism or other competent authorities.)