Vietnam Film Production
PTIT

VIETNAM FILM DEVELOPMENT ASSOCIATION

Address: 32 Hao Nam Street, O Cho Dua Ward, Hanoi, Vietnam

Email: officevfda@gmail.com

Website: vfda.vn

FILMING LOCATIONS

  • All Nationwide Locations
  • Hanoi Filming Locations
  • Ho Chi Minh City Locations
  • Da Nang Filming Locations
  • Ninh Binh Filming Locations
  • Quang Ninh Filming Locations

PERMITS & SUPPORT

  • Filming Permits Guide
  • Local Field Support
  • Authority Coordination
  • Financial Incentives & Grants

QUICK LINKS

  • About PAI & VFDA
  • Frequently Asked Questions (FAQ)
  • Cinema News & Insights
  • Search Film Database
  • Submit Coordination Request

Sponsored by Vietnam Film Development Association and Posts and Telecommunications Institute of Technology

Copyright © 2026 Ha Noi, VietnamTerms of ServicePrivacy Policy
Vietnam Film Production
HOMELOCATIONSPERMITSFIELD SUPPORTFINANCIAL SUPPORTNEWS
Log in
Home
Locations

Lao Cai Province

PRODUCTION-READYPAI 66.0

Lao Cai Province

View legal documents

No matching results found

  • 24

    Filming locations

  • 6 days

    Permit processing time

  • 5 vehicle types

    Accessibility

  • Large / Medium

    Suitable crew size

  • Available

    Local Support Agencies

Overview

Lao Cai, a border region at the forefront of the Northwest, is a majestic natural painting featuring overlapping mountains, cloud-covered valleys, and terraced fields winding through vast forests. Not only possessing the characteristic beauty of the northern mountainous region, Lao Cai is also the convergence of the rich cultural identities of many ethnic groups such as the Mong, Dao, Tay, and Giay, expressed through traditional costumes, festivals, highland markets, and long-standing customs. Besides its pristine beauty, Lao Cai also carries the vitality of a dynamic tourism, trade, and border economic center, with a vibrant commercial rhythm alongside the development of resort services and eco-tourism. Especially for filmmakers, Lao Cai opens up a deeply cinematic mountain backdrop, from magnificent terraced fields, highland villages, and white-cloud valleys to winding mountain passes and unique ethnic cultural spaces. The fascinating seasonal changes of the landscape along with the depth of indigenous culture create a rich source of creative inspiration for cinematic works.

PAI SCORE

66.06012345678960123456789.00123456789/ 100

PRODUCTION-READY
FinancialsupportInformationsupportFieldsupportLegalproceduresProductioninfrastructure

PROCEDURES & PERMITS

Average permit processing time
6 days
Receiving agency
Department of Culture, Sports and Tourism of Lao Cai Province
Submission address
No. 2, Nguyen Van Mau Street, Yen Binh Commune, Lao Cai Province
Contact email
contact-svhttdl@laocai.gov.vn
Contact information
02163.862.246
Permit workflow
  1. Step 1:Chuẩn bị hồ sơ (kịch bản tóm tắt, danh sách thành viên đoàn, thời gian và địa điểm quay cụ thể).
  2. Step 2:Nộp hồ sơ xin phép tại bộ phận Một cửa của Sở Văn hóa, Thể thao và Du lịch tỉnh Lào Cai
  3. Step 3:Chờ thẩm định, giải trình bối cảnh (nếu được yêu cầu) và nhận giấy phép.
View procedure guide

FEATURED LOCATIONS IN LAO CAI PROVINCE

View all locations
  • Muong Hoa Valley & Sa Pa Ancient Stone Field

    Muong Hoa Valley & Sa Pa Ancient Stone Field

    PAI 66.0

    Lao Cai Province

  • Hoang A Tuong Mansion & Bac Ha Weekend Market

    Hoang A Tuong Mansion & Bac Ha Weekend Market

    PAI 66.0

    Lao Cai Province

  • Raspberry Hill (Đồi Mâm Xôi)

    Raspberry Hill (Đồi Mâm Xôi)

    PAI 66.0

    Lao Cai Province

  • Suoi Giang Ancient Shan Tuyet Tea Region

    Suoi Giang Ancient Shan Tuyet Tea Region

    PAI 66.0

    Lao Cai Province

  • Thac Ba Lake

    Thac Ba Lake

    PAI 66.0

    Lao Cai Province

  • Song Lam Waterfall

    Song Lam Waterfall

    PAI 66.0

    Lao Cai Province

INFRASTRUCTURE

A. Access & accommodation

  • Transport infrastructure

    Railway station — Lao Cai Railway Station, Inter-provincial expressway — Noi Bai – Lao Cai Expressway (CT.05), a vital arterial route connecting directly from the capital Hanoi to the border.

  • Vehicle accessibility

    Container truck accessible — Heavy-duty container trucks operate continuously along the CT.05 Expressway directly to the Kim Thanh border economic zone or industrial zones (such as Tang Loong)., Large truck accessible — 3 to 4-axle trucks transporting goods move easily along main national highways., 16-45 seat coach accessible — Large passenger coaches and sleeper buses operate 24/7 on the Hanoi - Sa Pa - Lao Cai route via widened, safely winding mountain pass road systems., 16-seat van and car accessible, Motorbike and light vehicles only

  • Accommodation quality

    6 4-5 star hotels, 18 3-star hotels, 740 homestays

B. Operational support capacity

  • Transport & mobility support

    Specialized equipment trucks, 16-45 seat coach rental, Taxi, Ride-hailing services

  • Equipment availability

    Basic equipment

  • Local support manpower

    Extras / background actors, Loading crew, Drivers, Security, Logistics crew

FINANCIAL SUPPORT & INCENTIVES

View financial policy details

Support / fee waiver policies

  • Investment incentives and direct financial support for projects focused on the development of the film industry and cultural creativity. (Condition: Organizations and individuals with film production or cultural heritage projects in the province/city.)
  • Value Added Tax (VAT) refund for expenses incurred during production and filming in the locality. (Condition: Film projects with foreign elements that meet the criteria for promoting Vietnamese culture, tourism, and the country and its people.)
  • Exemption or reduction of entrance and filming fees at state-managed historical sites and scenic landmarks. (Condition: Documentaries, public-information projects and non-commercial tourism promotion. Requires an official approval letter from the provincial/city culture authority.)

Logistics support

  • Authorization for the partial use of sidewalks and roadways for mobile parking and the staging of filming equipment. (Condition: Requires a filming permit and written approval of the traffic diversion plan from the competent local authority.)
  • Priority fast-track processing for temporary import and re-export procedures regarding specialized filming machinery and equipment from abroad. (Condition: Applicable to international co-production film projects, provided that complete documentation and a detailed equipment manifest are declared in advance to the Customs authorities.)
  • Local authorities will coordinate traffic control, temporary cordoning, and ensure security and order at public filming locations. (Condition: Submit an official request letter with the shooting script to the local commune/ward police at least 3–5 working days in advance.)

Accommodation support

  • Special preferential rates (10%–30% off the listed price) at 3- to 5-star hotels in the province/city. (Condition: Film crews must book a large volume of rooms (typically 10 rooms or more) or commit to a long-term stay at accommodation facilities that are official partners (Vendors) of the platform.)
  • Helping film crews access local tourism stimulus packages (including room discounts and complimentary vouchers for dining, laundry and meeting rooms for script readings). (Condition: Film projects that directly promote local culture and tourism, with written confirmation or sponsorship from the provincial/city culture or tourism authority.)
  • A network of serviced apartments and homestays near filming locations, with the best monthly rental discounts reserved for production crews, logistics teams and cast members who need privacy. (Condition: The production team must sign a long-term accommodation contract (exceeding 15 days or 1 month) facilitated by the designated local field support coordinator.)

International crew / project support

  • Support for filming permit procedures for projects involving foreign elements. (Condition: Film projects invested in or co-produced by foreign organizations or individuals, with scripts compliant with the regulations of the Vietnam Cinema Law.)
  • Priority customs clearance procedures (temporary import and re-export of equipment) for equipment brought into Vietnam from abroad. (Condition: The production crew must have been granted a filming permit in Vietnam and must provide an equipment inventory (packing list) that matches the customs declaration documents.)
  • Support for visa and entry procedures. (Condition: The film crew/cast list must be approved by the Ministry of Culture, Sports and Tourism or other competent authorities.)