VFP Logo

VIETNAM FILM DEVELOPMENT ASSOCIATION

Address: 32 Hao Nam Street, O Cho Dua Ward, Hanoi, Vietnam

Email: officevfda@gmail.com

Website: https://vfda.vn/en/

FILMING LOCATIONS

  • All Nationwide Locations
  • Hanoi Filming Locations
  • Ho Chi Minh City Locations
  • Da Nang Filming Locations
  • Ninh Binh Filming Locations
  • Quang Ninh Filming Locations

PERMITS & SUPPORT

  • Filming Permits Guide
  • Local Field Support
  • Authority Coordination
  • Financial Incentives & Grants

QUICK LINKS

  • About PAI & VFDA
  • Frequently Asked Questions (FAQ)
  • Cinema News & Insights
  • Search Film Database
  • Submit Coordination Request

Sponsored by Vietnam Film Development Association and Posts and Telecommunications Institute of Technology

Production Attractiveness Index (PAI)•Vietnam Film Platform

Copyright © 2026 Ha Noi, Vietnam

Terms of Service•Privacy Policy
VFP Logo
Log in
Log in
HOMELOCATIONSPERMITSFIELD SUPPORTFINANCIAL SUPPORTNEWS
Gia Lai Province
Home
Locations

Gia Lai Province

Gia Lai Province

Gia Lai Province - A Highland Land Intersecting with the Sea Gia Lai Province was established on June 12, 2025, through the merger of the former Gia Lai Province and Binh Dinh Province, in accordance with Resolution No. 202/2025/QH15 of the National Assembly. It is the second-largest province in the country by natural area (21,576.53 km²), with a population of over 3.5 million, and its administrative and political center is located in Quy Nhon City. Gia Lai possesses a rare and diverse topography: the West features the majestic Pleiku plateau with a cool climate, deeply connected to the Gong culture and the Jrai and Bahnar ethnic communities; the East features a long coastline with bays, rocky cliffs, and pristine beaches, along with numerous historical sites associated with the Champa Kingdom and the Tay Son movement. The combination of mountains, forests, the sea, and multi-layered cultural heritage makes Gia Lai a land with rich potential for use as a filming location for various film genres.

Overview

Gia Lai Province - A Highland Land Intersecting with the Sea Gia Lai Province was established on June 12, 2025, through the merger of the former Gia Lai Province and Binh Dinh Province, in accordance with Resolution No. 202/2025/QH15 of the National Assembly. It is the second-largest province in the country by natural area (21,576.53 km²), with a population of over 3.5 million, and its administrative and political center is located in Quy Nhon City. Gia Lai possesses a rare and diverse topography: the West features the majestic Pleiku plateau with a cool climate, deeply connected to the Gong culture and the Jrai and Bahnar ethnic communities; the East features a long coastline with bays, rocky cliffs, and pristine beaches, along with numerous historical sites associated with the Champa Kingdom and the Tay Son movement. The combination of mountains, forests, the sea, and multi-layered cultural heritage makes Gia Lai a land with rich potential for use as a filming location for various film genres.

View legal documents
PAI SCORE3.3/ 5

PRODUCTION-READY

012345FinancialsupportInformationsupportField supportLegalproceduresProductioninfrastructure
PAI SCORE3.3/ 5

PRODUCTION-READY

012345FinancialsupportInformationsupportField supportLegalproceduresProductioninfrastructure

14

Filming locations

5 days

Permit processing time

5 vehicle types

Accessibility

Medium / Large

Suitable crew size

Available

Local Support Agencies

14

Filming locations

5 days

Permit processing time

5 vehicle types

Accessibility

Medium / Large

Suitable crew size

Available

Local Support Agencies

FEATURED LOCATIONS IN GIA LAI PROVINCE

View all locations
Van Son Pottery Village

Van Son Pottery Village

Gia Lai Province

PAI 3.3

Production ready

Permit processing time5 days
Accessibility3 vehicle types
Suitable crew sizeMedium

View details

Chu Dang Ya

Chu Dang Ya

Gia Lai Province

PAI 3.3

Production ready

Permit processing time5 days
Accessibility2 vehicle types
Suitable crew sizeLarge

View details

De Gi Bay

De Gi Bay

Gia Lai Province

PAI 3.3

Production ready

Permit processing time5 days
Accessibility5 vehicle types
Suitable crew sizeMedium

View details

Mui Vi Rong (Dragon Fin Cape)

Mui Vi Rong (Dragon Fin Cape)

Gia Lai Province

PAI 3.3

Production ready

Permit processing time5 days
Accessibility4 vehicle types
Suitable crew sizeMedium

View details

Phu Gia Horse-Hat Craft Village

Phu Gia Horse-Hat Craft Village

Gia Lai Province

PAI 3.3

Production ready

Permit processing time5 days
Accessibility3 vehicle types
Suitable crew sizeMedium

View details

T'Nung Lake

T'Nung Lake

Gia Lai Province

PAI 3.3

Production ready

Permit processing time5 days
Accessibility3 vehicle types
Suitable crew sizeLarge

View details

Minh Thanh Pagoda

Minh Thanh Pagoda

Gia Lai Province

PAI 3.3

Production ready

Permit processing time5 days
Accessibility4 vehicle types
Suitable crew sizeMedium

View details

K50 Waterfall (Hang En)

K50 Waterfall (Hang En)

Gia Lai Province

PAI 3.3

Production ready

Permit processing time5 days
Accessibility2 vehicle types
Suitable crew sizeLarge

View details

Quang Trung Museum

Quang Trung Museum

Gia Lai Province

PAI 3.3

Production ready

Permit processing time5 days
Accessibility4 vehicle types
Suitable crew sizeMedium

View details

Eo Gio

Eo Gio

Gia Lai Province

PAI 3.3

Production ready

Permit processing time5 days
Accessibility4 vehicle types
Suitable crew sizeMedium

View details

Van Son Pottery Village

Van Son Pottery Village

Gia Lai Province

PAI 3.3

Production ready

Permit processing time5 days
Accessibility3 vehicle types
Suitable crew sizeMedium

View details

Chu Dang Ya

Chu Dang Ya

Gia Lai Province

PAI 3.3

Production ready

Permit processing time5 days
Accessibility2 vehicle types
Suitable crew sizeLarge

View details

De Gi Bay

De Gi Bay

Gia Lai Province

PAI 3.3

Production ready

Permit processing time5 days
Accessibility5 vehicle types
Suitable crew sizeMedium

View details

Mui Vi Rong (Dragon Fin Cape)

Mui Vi Rong (Dragon Fin Cape)

Gia Lai Province

PAI 3.3

Production ready

Permit processing time5 days
Accessibility4 vehicle types
Suitable crew sizeMedium

View details

Phu Gia Horse-Hat Craft Village

Phu Gia Horse-Hat Craft Village

Gia Lai Province

PAI 3.3

Production ready

Permit processing time5 days
Accessibility3 vehicle types
Suitable crew sizeMedium

View details

T'Nung Lake

T'Nung Lake

Gia Lai Province

PAI 3.3

Production ready

Permit processing time5 days
Accessibility3 vehicle types
Suitable crew sizeLarge

View details

Minh Thanh Pagoda

Minh Thanh Pagoda

Gia Lai Province

PAI 3.3

Production ready

Permit processing time5 days
Accessibility4 vehicle types
Suitable crew sizeMedium

View details

K50 Waterfall (Hang En)

K50 Waterfall (Hang En)

Gia Lai Province

PAI 3.3

Production ready

Permit processing time5 days
Accessibility2 vehicle types
Suitable crew sizeLarge

View details

Quang Trung Museum

Quang Trung Museum

Gia Lai Province

PAI 3.3

Production ready

Permit processing time5 days
Accessibility4 vehicle types
Suitable crew sizeMedium

View details

Eo Gio

Eo Gio

Gia Lai Province

PAI 3.3

Production ready

Permit processing time5 days
Accessibility4 vehicle types
Suitable crew sizeMedium

View details

FINANCIAL SUPPORT & INCENTIVES

Support / fee waiver policies

Accommodation support

Transport support

International crew / project support

PROCEDURES & PERMITS

View procedure guide
Average permit processing time5 days
Receiving agencyDepartment of Culture, Sports and Tourism of Gia Lai Province
Submission address35 Le Loi, Gia Lai Province
Contact emailvp@svhttdl.gialai.gov.vn
Contact information02563.822.231
Permit workflow
  • Step 1:Prepare the application documents (synopsis, crew list, and specific filming schedule and locations).
  • Step 2:Submit the application for the permit at the One-Stop Shop of the Gia Lai Department of Culture, Sports and Tourism.
  • Step 3:Awaiting review, location clarification (if requested), and license issuance.

INFRASTRUCTURE

A. Access & accommodation

Transport infrastructure

International airport, Railway station, Seaport

Vehicle accessibility

Accessible by 16-45 seat coaches, Accessible by heavy trucks, Accessible by boat, Accessible by motorbike and rudimentary vehicles, Accessible by 16-seat vans and passenger cars

Accommodation quality

2 4-5 star hotels, 30 3-star hotels, 52 homestays

B. Operational support capacity

Transport & mobility support

Taxi, Ride-hailing services, 16-45 seat vehicle rental

Equipment availability

Full range of specialized equipment, Basic equipment

Local support manpower

Extras, Logistics, Loading and unloading, Drivers, Security

FINANCIAL SUPPORT

Gia Lai Province offers attractive financial incentives for international and domestic film crews. Contact the locality for details on tax relief, fee waivers, and production cost support.