VFP Logo

VIETNAM FILM DEVELOPMENT ASSOCIATION

Address: 32 Hao Nam Street, O Cho Dua Ward, Hanoi, Vietnam

Email: officevfda@gmail.com

Website: https://vfda.vn/en/

FILMING LOCATIONS

  • All Nationwide Locations
  • Hanoi Filming Locations
  • Ho Chi Minh City Locations
  • Da Nang Filming Locations
  • Ninh Binh Filming Locations
  • Quang Ninh Filming Locations

PERMITS & SUPPORT

  • Filming Permits Guide
  • Local Field Support
  • Authority Coordination
  • Financial Incentives & Grants

QUICK LINKS

  • About PAI & VFDA
  • Frequently Asked Questions (FAQ)
  • Cinema News & Insights
  • Search Film Database
  • Submit Coordination Request

Sponsored by Vietnam Film Development Association and Posts and Telecommunications Institute of Technology

Production Attractiveness Index (PAI)•Vietnam Film Platform

Copyright © 2026 Ha Noi, Vietnam

Terms of Service•Privacy Policy
VFP Logo
Log in
Log in
HOMELOCATIONSPERMITSFIELD SUPPORTFINANCIAL SUPPORTNEWS
Bac Ninh Province
Home
Locations

Bac Ninh Province

Bac Ninh Province

Bac Ninh, the cradle of the thousand-year-old Kinh Bac culture, is a canvas where the depth of heritage and the pulse of the modern era intertwine. The serene beauty of this land, renowned for its talented people, is vividly expressed through the soulful melodies of Quan Ho folk songs, sacred thousand-year-old pagodas, and famous traditional craft villages. Beyond the nostalgic charm of the Quan Ho region, modern-day Bac Ninh radiates the vitality of a leading high-tech industrial hub, featuring a modern urban landscape, a vibrant economic pace, and a local cuisine rich in the distinctive flavors of Kinh Bac. For filmmakers, Bac Ninh offers a "vivid film studio" filled with artistic inspiration. The diversity of its spiritual spaces, moss-covered ancient villages, and vast futuristic industrial backdrops, combined with its convenient location as a gateway for trade, makes this Quan Ho land an unmissable destination for creative potential.

Overview

Bac Ninh, the cradle of the thousand-year-old Kinh Bac culture, is a canvas where the depth of heritage and the pulse of the modern era intertwine. The serene beauty of this land, renowned for its talented people, is vividly expressed through the soulful melodies of Quan Ho folk songs, sacred thousand-year-old pagodas, and famous traditional craft villages. Beyond the nostalgic charm of the Quan Ho region, modern-day Bac Ninh radiates the vitality of a leading high-tech industrial hub, featuring a modern urban landscape, a vibrant economic pace, and a local cuisine rich in the distinctive flavors of Kinh Bac. For filmmakers, Bac Ninh offers a "vivid film studio" filled with artistic inspiration. The diversity of its spiritual spaces, moss-covered ancient villages, and vast futuristic industrial backdrops, combined with its convenient location as a gateway for trade, makes this Quan Ho land an unmissable destination for creative potential.

View legal documents
PAI SCORE3.2/ 5

PRODUCTION-READY

012345FinancialsupportInformationsupportField supportLegalproceduresProductioninfrastructure
PAI SCORE3.2/ 5

PRODUCTION-READY

012345FinancialsupportInformationsupportField supportLegalproceduresProductioninfrastructure

16

Filming locations

6 days

Permit processing time

6 vehicle types

Accessibility

Large / Medium

Suitable crew size

Available

Local Support Agencies

16

Filming locations

6 days

Permit processing time

6 vehicle types

Accessibility

Large / Medium

Suitable crew size

Available

Local Support Agencies

FEATURED LOCATIONS IN BAC NINH PROVINCE

View all locations
Tay Yen Tu Spiritual and Ecological Tourism Area

Tay Yen Tu Spiritual and Ecological Tourism Area

Bac Ninh Province

PAI 3.2

Production ready

Permit processing time6 days
Accessibility4 vehicle types
Suitable crew sizeLarge

View details

Suoi Mo

Suoi Mo

Bac Ninh Province

PAI 3.2

Production ready

Permit processing time6 days
Accessibility4 vehicle types
Suitable crew sizeLarge

View details

Dong Cao Plateau

Dong Cao Plateau

Bac Ninh Province

PAI 3.2

Production ready

Permit processing time6 days
Accessibility4 vehicle types
Suitable crew sizeLarge

View details

Cam Son Lake

Cam Son Lake

Bac Ninh Province

PAI 3.2

Production ready

Permit processing time6 days
Accessibility4 vehicle types
Suitable crew sizeLarge

View details

Khe Ro Ecotourism Area

Khe Ro Ecotourism Area

Bac Ninh Province

PAI 3.2

Production ready

Permit processing time6 days
Accessibility4 vehicle types
Suitable crew sizeLarge

View details

Khuon Than Lake

Khuon Than Lake

Bac Ninh Province

PAI 3.2

Production ready

Permit processing time6 days
Accessibility4 vehicle types
Suitable crew sizeLarge

View details

Bac Ninh Lonely Tree

Bac Ninh Lonely Tree

Bac Ninh Province

PAI 3.2

Production ready

Permit processing time6 days
Accessibility4 vehicle types
Suitable crew sizeMedium

View details

Dau Pagoda

Dau Pagoda

Bac Ninh Province

PAI 3.2

Production ready

Permit processing time6 days
Accessibility4 vehicle types
Suitable crew sizeLarge

View details

Bo Da Pagoda

Bo Da Pagoda

Bac Ninh Province

PAI 3.2

Production ready

Permit processing time6 days
Accessibility4 vehicle types
Suitable crew sizeLarge

View details

Tho Ha Ancient Village

Tho Ha Ancient Village

Bac Ninh Province

PAI 3.2

Production ready

Permit processing time6 days
Accessibility3 vehicle types
Suitable crew sizeLarge

View details

Tay Yen Tu Spiritual and Ecological Tourism Area

Tay Yen Tu Spiritual and Ecological Tourism Area

Bac Ninh Province

PAI 3.2

Production ready

Permit processing time6 days
Accessibility4 vehicle types
Suitable crew sizeLarge

View details

Suoi Mo

Suoi Mo

Bac Ninh Province

PAI 3.2

Production ready

Permit processing time6 days
Accessibility4 vehicle types
Suitable crew sizeLarge

View details

Dong Cao Plateau

Dong Cao Plateau

Bac Ninh Province

PAI 3.2

Production ready

Permit processing time6 days
Accessibility4 vehicle types
Suitable crew sizeLarge

View details

Cam Son Lake

Cam Son Lake

Bac Ninh Province

PAI 3.2

Production ready

Permit processing time6 days
Accessibility4 vehicle types
Suitable crew sizeLarge

View details

Khe Ro Ecotourism Area

Khe Ro Ecotourism Area

Bac Ninh Province

PAI 3.2

Production ready

Permit processing time6 days
Accessibility4 vehicle types
Suitable crew sizeLarge

View details

Khuon Than Lake

Khuon Than Lake

Bac Ninh Province

PAI 3.2

Production ready

Permit processing time6 days
Accessibility4 vehicle types
Suitable crew sizeLarge

View details

Bac Ninh Lonely Tree

Bac Ninh Lonely Tree

Bac Ninh Province

PAI 3.2

Production ready

Permit processing time6 days
Accessibility4 vehicle types
Suitable crew sizeMedium

View details

Dau Pagoda

Dau Pagoda

Bac Ninh Province

PAI 3.2

Production ready

Permit processing time6 days
Accessibility4 vehicle types
Suitable crew sizeLarge

View details

Bo Da Pagoda

Bo Da Pagoda

Bac Ninh Province

PAI 3.2

Production ready

Permit processing time6 days
Accessibility4 vehicle types
Suitable crew sizeLarge

View details

Tho Ha Ancient Village

Tho Ha Ancient Village

Bac Ninh Province

PAI 3.2

Production ready

Permit processing time6 days
Accessibility3 vehicle types
Suitable crew sizeLarge

View details

FINANCIAL SUPPORT & INCENTIVES

Support / fee waiver policies

Accommodation support

Transport support

International crew / project support

PROCEDURES & PERMITS

View procedure guide
Average permit processing time6 days
Receiving agencyBac Ninh Department of Culture, Sports and Tourism
Submission addressFloors 8, 9, 10 - Building A, Inter-agency Complex - 3/2 Square - Bac Giang Ward - Bac Ninh Province
Contact emailsvhttdl@bacninh.gov.vn
Contact information02043.856.310
Permit workflow
  • Step 1:Prepare the application documents (synopsis, crew list, and specific filming schedule and locations).
  • Step 2:Submit your application at the Bac Ninh Public Administrative Service Center (Department of Culture, Sports and Tourism counter) or online via the Bac Ninh Public Service Portal.
  • Step 3:Awaiting review, location clarification (if requested), and license issuance.

INFRASTRUCTURE

A. Access & accommodation

Transport infrastructure

Railway station, Inter-provincial highway

Vehicle accessibility

Accessible by container trucks, Accessible by 16-45 seat coaches, Accessible by motorcycles and rudimentary vehicles, Accessible by heavy-duty trucks, Accessible by 16-seat vans and passenger cars, Accessible by boat

Accommodation quality

5 4-5 star hotels, 40 3-star hotels, 10 homestays

B. Operational support capacity

Transport & mobility support

Specialized equipment transport trucks, Taxi, 16-45 seat coach rental, Ride-hailing services

Equipment availability

Full range of specialized equipment

Local support manpower

Extras, Drivers, Logistics, Security, Loading and unloading crew

FINANCIAL SUPPORT

Bac Ninh Province offers attractive financial incentives for international and domestic film crews. Contact the locality for details on tax relief, fee waivers, and production cost support.