Nghinh Phong Tower
Binh Kien, Binh Kien Ward, Dak Lak Province
Production ready
PAI 3.3
Crew size: Medium (16-50)
Processing time: 6 days
Category: Natural landscapes
Nghinh Phong Tower - A coastal architectural icon of Tuy Hoa. Nghinh Phong Tower is located in Binh Kien Ward, Phu Yen Province (Note: The original text mentions Dak Lak, but the tower is geographically located in Tuy Hoa, Phu Yen). Built in 2020, the structure consists of two towers approximately 35m and 30m high, situated within a 7,190m² square facing the sea. Regarding cultural and architectural value, the structure is inspired by the legend of “Dragon and Fairy” and the basalt rock formations of Ganh Da Dia. The main structure comprises two clusters with a total of 100 stone columns, creating a distinctive symmetrical architectural form. The combination of the square, the sea, the horizon, and the lighting system allows for multi-layered visual compositions within a single setting. For film production, this location is suitable for contemporary feature films, architectural and urban documentaries, local cultural promotional films, and coastal exterior scenes. The open space is also ideal for wide shots, night scenes, and large-scale productions, though filming plans must be coordinated in advance with local authorities. Content summary: PTIT Photo source: VnExpress; internet
Location fees
General information
Charging model
No data available
Deposit
No data available
Notes
There are currently no general standard fee regulations by law. Film crews must contact the location management unit directly for specific guidance.
Filming location fee schedule
| Item | Fee |
|---|---|
| Hourly fee | No data available |
| Daily fee | No data available |
| Overtime fee | No data available |
Applicable policy
Fee discount/waiver policy
Preferential policies apply to domestic and international film crews.
Applicable conditions
Film crews are required to submit an official request letter detailing the crew size and shooting schedule, and may be asked to provide a script or synopsis for management review and approval: - For foreign film crews: The dossier must be submitted to the Ministry of Culture, Sports and Tourism to apply for a License for Providing Film Production Services Using Settings in Vietnam. Processing time is 20 days from the date of receiving a valid dossier. - For domestic film crews: No permit is required from state management agencies for cinema, but direct permission must be obtained from the agency or unit managing the location.
Location rules
Do not drill, chisel, nail, glue, or fix equipment onto the tower structure, stone surfaces, or architectural elements.
Do not alter the landscape of the square, coastal park, or surrounding beach area.
Do not discharge waste, wastewater, oil, chemicals, or production materials into the environment.
Do not use fire, fireworks, smoke, or special effects that may pose a risk to the structure, electrical systems, or the environment without an approved safety plan.
Infrastructure
Accessibility
Canoe
Boat
16-45 seat vehicle
Car / 16-seat vehicle
Container truck
Motorbike
Production support
Drone filming allowed
Night filming allowed
Facilities
Near hospital
4G/5G internet
Waiting area
Set building area
Water source
Restrooms
Special Hazards
Strong winds and coastal weather conditions
Storms, heavy rain, and rough seas
Location map
Contact information
Temperature
32.9°C
Feels like 33.1°C
Weather
Mây rải rác
Humidity 72%
Wind direction
Southwest
7.3 m/s
Sunrise / sunset










