Nam Muc Hydropower Plant

National Highway 6, Nam Nen Commune, Dien Bien Province

Production ready

PAI 0.5

Crew size: Large (50+)

Processing time: No data available

Category: Industrial & production

Nam Muc Hydropower Plant - An energy landmark amidst the Northwest mountains. Located on the Nam Muc River in Nam Nen Commune, Dien Bien Province, the Nam Muc Hydropower Plant is set against the backdrop of the majestic Northwest mountains. The facility has an installed capacity of 44 MW, featuring two turbine units, and includes a large-scale system of dams, reservoirs, energy conduits, and power generation facilities. From a visual perspective, the site creates a striking contrast between concrete structures, technical engineering, and the surrounding mountainous terrain, water surfaces, and rivers. Elements such as the dam body, water intake gates, power plant, access roads, and reservoir space offer diverse visual layers, ranging from panoramic shots of the facility nestled in the mountains to close-ups of machinery and industrial textures. This location is suitable for feature films, documentaries, and works exploring themes of industry, energy, highland life, or the relationship between humanity and nature. The site also holds potential for storytelling regarding labor, engineering, economic development, and the transformation of the Northwest landscape. Information compiled by: PTIT Photo credit: Bitexco Power.

Location fees

1

General information

Charging model

No data available

Deposit

No data available

Notes

Location rental costs and usage conditions are negotiated directly with the management unit prior to filming. In the event of damage to property or facilities, the crew is responsible for covering repair/replacement costs as agreed upon with the management unit.

2

Filming location fee schedule

ItemFee
Hourly feeNo data available
Daily feeNo data available
Overtime feeNo data available
3

Applicable policy

Fee discount/waiver policy

Preferential policies are available for domestic and international film crews.

Applicable conditions

Crews must register and receive approval from the management unit before filming. The use of props, filming equipment, lighting, or any modifications to the space must be notified and approved in advance. Crews are responsible for preserving property and facilities, and must restore the location to its original state after filming.

Location rules

Written approval for filming must be obtained from the Department of Culture, Sports and Tourism of Dien Bien Province.

Strictly prohibited to cut down protected forest trees, use fire/flammable materials in the forest, and must strictly comply with regulations on the protection of wild flora and fauna.

Drone operations require a flight permit from the Operations Department - General Staff of the Vietnam People's Army.

Infrastructure

Accessibility

Canoe

Boat

16-45 seat vehicle

Car / 16-seat vehicle

Container truck

Motorbike

Production support

Drone filming allowed

Night filming allowed

Transport service

Authority coordination support

Low noise

Facilities

Three-phase power

Near hospital

4G/5G internet

Waiting area

Set building area

Water source

Backup power

Restrooms

Location map

Contact information

ManagerDepartment of Culture, Sports and Tourism of Dien Bien Province
AddressHim Lam Street, Dien Bien Phu City, Dien Bien Province.
Working hours8:00 - 17:00, Monday to Friday
Phone number02153.825.391

Temperature

29.7°C

Feels like 34.6°C

Weather

Mưa nhẹ

Humidity 82%

Wind direction

Northeast

11 m/s

Sunrise / sunset

06:02|18:02

Similar locations in Dien Bien Province

View all