Ho Chi Minh City Metro Line 1
Ben Thanh Station, Ben Thanh Ward, Ho Chi Minh City
Production ready
PAI 3.3
Crew size: Medium (16-50)
Processing time: 6 days
Category: Urban spaces
HCMC Metro Line 1 – Modern Urban Setting The Ben Thanh – Suoi Tien Metro Line 1 is an urban railway spanning approximately 19.7 km, featuring 3 underground stations and 11 elevated stations. The line connects the central area of Ho Chi Minh City with the eastern part of the city. In terms of cinematic potential, the metro line offers a diverse spatial system ranging from underground stations, platforms, and elevated tracks to the trains themselves and the urban landscape along the route. The extended tracks and elevated pillar-and-beam structures create strong visual leading lines, while the station spaces allow for wide, medium, and close-up shots of architectural details, as well as camera angles tracking the movement of the trains. The elevated sections also provide opportunities to capture the city from a unique vantage point. This location is suitable for modern dramas, urban films, socio-psychological films, action movies, documentaries, and commercials, particularly for scenes depicting the rhythm of life, transportation, and the contemporary urban landscape.
#tuyến metro số 1 tp.hcm
#hồ chí minh
#phố cổ
#đô thị
#phim tâm lý
#phim hành động
#phim tài liệu
#phim đô thị
Location fees
General information
Charging model
No data available
Deposit
No data available
Notes
No data available
Filming location fee schedule
| Item | Fee |
|---|---|
| Hourly fee | No data available |
| Daily fee | No data available |
| Overtime fee | No data available |
Applicable policy
Fee discount/waiver policy
Preferential policies apply to both domestic and international film crews.
Applicable conditions
No data available
Location rules
Do not access tracks, train operation areas, or technical zones without authorization.
Do not litter; maintain general cleanliness.
Do not move, dismantle, or interfere with equipment, signage, or components of the metro system without authorization.
Responsible for maintaining cleanliness, property, and the original state of the premises.
Infrastructure
Accessibility
16-45 seat vehicle
Car / 16-seat vehicle
Motorbike
Production support
Drone filming allowed
Night filming allowed
Transport service
Authority coordination support
Facilities
Three-phase power
Near hospital
4G/5G internet
Waiting area
Set building area
Water source
Backup power
Restrooms
Special Hazards
High passenger volume
Location map
Contact information
Temperature
28°C
Feels like 32.4°C
Weather
Mưa nhẹ
Humidity 75%
Wind direction
Northeast
13.8 m/s
Sunrise / sunset










